Subic Bay Freeport Zone – On Dec. 15, 2013, PCSPC received formal turn-over from its contractor of a newly constructed barge loading facility with an overall length of 200 meters designed to cater for smaller vessels ranging from 500 to 6,400 DWT. The new jetty is supported by seven mooring dolphins and is equipped with state of the art marine loading arm produced and manufactured in Germany by EMCO WHEATON® and Rubber Fender System from TRELLEBORG®.
The new jetty is currently being outfitted with pipes for receiving and discharging of petroleum products to and from storage tanks situated inside Boton Tank Farm, SBFZ which is scheduled to be completed by end of February 2014.